Salient Specifications

     

1. Dredge Configuration

 

The dredge can be classified into the following:-

 

(a).

Pontoons

   

(b).

Superstructures

   

(c).

Digging Section

   

(d).

Screening

   
(e).
Scrubbing    

(f).

Treatment Plants,

   

the specification of which is summarized hereunder.

   
     
2. Pontoons    

2.1

Maximum Length

= 94.5 M (310’-0”)

2.2

Maximum Width (stern)

= 32.7 M (107’-0”)

2.3

Maximum Width (bow)

= 20.5 M ( 67’-3”)

2.4

Pontoon Height

= 2.95 M ( 9’-8”)

2.5

Expected Draught (light)

= 1.60 M ( 5’-3”)

2.6

Expected Draught (loaded)

= 1.28 M ( 4’-2”)

2.7

Expected Weight (light)

= 3,200 Tonne

2.8

Expected Weight (loaded)

= 4,443 tonne

2.9

Net Area

= 2,490.14 M2 (26,790 ft2)

2.10

Moment to change trim 1”

= 1,171 T.FT
       
3. Pontoons    

3.1

Length of Superstructure

= 110.8 M (363.4 ft)

3.2

Length of dredge with ladder up, from bottom tumbler to end of overburden chute

= 130.0 M (426.4 ft)

3.3

Maximum width of dredge

= 32.7 M (107.0 ft)

3.4

Height of top tumbler from deck

= 14.4 M (47.2 ft)

3.5

Maximum height of roof from deck

= 21.0 M ( 68.8 ft)
       
4. Digging Section    

4.1

Length of ladder

= 51.2 M (168 ft)

4.2

Bucket capacity

= 14.cu.ft (0.397 m3)

4.3

Number of buckets on ladder

= 50

4.4

Number of buckets in band

= 111

4.5

Number of ladder rollers on ladder

= 20


4.6

Ladder is raised or lowered by a winch through a pair of 6 x 25 (12/12/9.3) Horse Power of Winch

= 175 HP


4.7

The traversing of the dredge
forward, sideways is efected by five wire ropes from drums of the mooring winch. Horse Power of Winch

= 30 HP

4.8

Maximum digging depth

= 30 M
       
DIGGING CAPACITY    
The dredge is designed to operate in the following modes :-    
  Stripping at 22 bucket per minute (bpm)
Treating at 9.4 bpm
   
  Operating Hours = 600 hrs /mth
  Treating time = 200 hrs /mth
  Stripping time = 400 hrs /mth
       
  Treating Volume = 168 m3 / hr
  Stripping Volume = 393 m3 / hr
       
  Dredging volume per 600 hrs month    
  Treating = 33,600 M3
  Stripping = 157,200 M3
  Total vol per month = 190,800 M3
 

The above specifications are subject to change without prior notice.

Please contact us for further details.
 